(Standards referenced from Marylebone Cricket Club (MCC) & International Cricket Council (ICC))
Practice Net Pitch – 20–30 m area (academies / individuals)
Mini Ground – 30–50 yards boundary (schools / small clubs)
Full Ground – 60–75 yards boundary (competitive / league play)
| Area | Measurement |
|---|---|
| Pitch Length | 22 yards (20.12 m) |
| Pitch Width | 10 ft (3.05 m) |
| Boundary Radius | 50–75 yards (45–68 m) |
| Practice Net Pitch | 25 m length × 3.6–4 m width |
| Run-up Area | 15–20 m behind bowler’s crease |
| Type | Pros | Cons | Lifespan |
|---|---|---|---|
| Natural Turf Pitch | Realistic bounce, match standard | High maintenance, weather-sensitive | Requires daily care |
| Cement Pitch + Matting | Low cost, school-friendly | Less realistic bounce | 5–7 years |
| Synthetic Turf Pitch | Low maintenance, all-weather | Slightly artificial bounce | 7–10 years |
Clear and level ground
Soil compaction using heavy roller
Provide ~1% slope for drainage
300–400 mm clay-soil mix layer
Compacted multiple times with roller
Grass: Bermuda / Cynodon species
Regular watering during establishment
RCC slab (10–12 m × 3 m typical size)
Coir or jute matting installed on top
Asphalt or concrete base
Turf carpet bonded with adhesive
Sand or rubber infill for cushioning
Compacted soil base
Sandy loam top layer
Grass seeding and rolling
Synthetic grass
Rubber infill system
Perforated drainage pipes along boundary
~1% slope towards drainage outlets
Prevents water logging and surface damage
30–40 mm mesh nets
12–15 ft height
Galvanized steel poles for durability
| Usage | Lux Level |
|---|---|
| Practice Pitch | ~300 lux |
| Competitive Ground | 500–800 lux |
Floodlight towers positioned evenly to reduce shadows.
| Pitch Type | Key Maintenance Tasks |
|---|---|
| Turf | Daily rolling (in season), watering, mowing, clay & sand top-dressing |
| Matting | Replace worn mats, keep clean |
| Synthetic | Periodic brushing & infill leveling |
| Stage | Duration |
|---|---|
| Site Preparation & Leveling | 2–4 weeks |
| Pitch Base Construction | 2–3 weeks |
| Turf Growing & Maturing | 6–8 weeks (natural turf only) |
| Total Duration | ~3–4 months (turf) / 1–2 months (synthetic or cement) |
Stumps & boundary ropes
Scoreboards (manual or digital)
Sight screens
Benches & dugouts
Irrigation/sprinkler system
Equipment storage room