(WSF = World Squash Federation)
| Type | Best For | Key Features |
|---|---|---|
| Single Squash Court | Clubs, schools, homes | One court, 21 ft wide |
| Double / Competition Court | Academies, sports complexes | Tournament-level, optional glass back wall |
| Portable / Glass Court | Events, exhibitions | 4-wall glass, fully movable |
| Feature | Measurement |
|---|---|
| Court Length | 9.75 m (32 ft) |
| Court Width | 6.4 m (21 ft) |
| Front Wall Height | 4.57 m (15 ft) |
| Back Wall Height | 2.13 m (7 ft) |
| Tin Height | 480 mm (18.9 in) |
| Service Line Height | 1.78 m (5 ft 10 in) |
| Clear Height Above Court | Minimum 5.64 m (18.5 ft) |
| Run-off Clearance | 0.6–1 m minimum around court |
Ensure minimum internal clear height (5.64 m)
Provide proper ventilation system
RCC slab flooring with ±2 mm level tolerance
| Material | Features | Approx Cost (India) |
|---|---|---|
| Hardwood (Maple / Teak) | High durability, excellent grip, WSF standard | ₹8–12 lakh |
| Engineered Wood + Synthetic Finish | Slightly economical, good cushioning | ₹6–9 lakh |
Specifications:
Thickness: 21–22 mm planks
Finish: Anti-skid polyurethane coating
Shock absorption: ~25% for player safety
| Type | Features | Approx Cost (India) |
|---|---|---|
| Hard Plaster Walls | Traditional, cost-effective, strong rebound | ₹4–6 lakh |
| Glass Back Wall | Modern look, professional visibility | ₹7–10 lakh |
| 4-Side Glass Court (Portable) | Premium tournament setup | ₹35–50 lakh |
Wall Notes:
Front & side walls: Special squash-grade hard plaster or glass
Back wall: Toughened safety glass (preferred for tournaments)
Line markings painted precisely as per WSF regulations
Red boundary lines on front, side & back walls
Service line and out lines clearly marked
Floor service boxes painted or inlaid
500–750 lux uniform lighting
Non-glare LED fixtures
Shadow-free installation (top-mounted preferred)
Maintain 20–25°C indoor temperature
Good airflow circulation
Dehumidifiers recommended in humid climates
| Stage | Duration |
|---|---|
| Site Prep & Flooring | 3–4 weeks |
| Wall Plaster / Glass Installation | 2–3 weeks |
| Marking & Finishing | 1 week |
| Lighting & Accessories | 1 week |
| Total Duration | ~7–9 weeks |
| Component | Maintenance Tips |
|---|---|
| Floor | Daily sweeping, weekly damp mop, re-polish every 2–3 years |
| Walls | Clean ball marks, repaint lines annually |
| Glass Walls | Regular glass cleaning, inspect for cracks/chips |