(Standards referenced from Fédération Internationale de Volleyball – FIVB)
Before starting construction, decide:
Type of Court – Outdoor hard court, synthetic turf, sand/beach court, or indoor wooden flooring
Usage Level – School / Recreational / Club / Professional tournaments
Space & Budget – Surface type significantly affects cost
Orientation – North–South orientation minimizes sun glare
| Feature | Dimensions |
|---|---|
| Court Size | 18 m × 9 m (59 ft × 29.5 ft) |
| Free Zone (Clear Space) | Minimum 3 m (5–6 m for tournaments) |
| Ceiling Height (Indoor) | ≥7 m (Ideal ≥12 m for professional play) |
| Net Height – Men | 2.43 m |
| Net Height – Women | 2.24 m |
| Pole Distance from Sideline | ~1 m outside boundary |
Clear and level the land
Provide ~1% slope for outdoor drainage
Proper soil compaction to prevent sinking
150–200 mm compacted stone layer
Asphalt or concrete slab on top
Smooth finish for surface coating
Excavate 40–50 cm depth
Install gravel drainage layer
Fill with 30–40 cm clean, fine, rounded sand
(Avoid river sand to prevent compaction)
| Surface Type | Pros | Cons | Lifespan |
|---|---|---|---|
| Synthetic Acrylic (Outdoor) | Low maintenance, durable, good grip | Hard on knees | 5–8 years |
| Synthetic Turf | Softer on joints, all-weather | Requires brushing & infill maintenance | 5–7 years |
| Beach / Sand | Safe for falls, excellent training | Needs frequent raking | Continuous upkeep |
| Indoor Wooden (Maple / Synthetic Wood) | Tournament standard, cushioned | Higher initial cost | 10–15 years (with polishing) |
Heavy-duty galvanized or powder-coated steel poles
Adjustable net heights (men, women, junior levels)
Guy wires for outdoor wind stability
Fencing
10–12 ft high chain-link mesh around perimeter
Lighting Standards
| Usage | Lux Level |
|---|---|
| Recreational | ~300 lux |
| Professional | 500+ lux |
💡 Estimated Lighting Cost (India): ₹3–7 lakh depending on lux requirement and area.
UV-stable paint or prefabricated synthetic lines
Sand courts: Strap lines anchored securely
| Stage | Duration |
|---|---|
| Site Preparation | 1–2 weeks |
| Base & Surface Installation | 2–3 weeks |
| Net, Fencing & Lighting Setup | 1–2 weeks |
| Total Duration | ~4–6 weeks |
Hard / Synthetic Court: Regular sweeping, recoating every 5–8 years
Sand Court: Rake frequently, remove debris, replace sand every 2–3 years
Indoor Wooden Court: Daily dust mopping, polishing every 1–2 years
Referee stand
Team benches
Manual or digital scoreboard
Boundary markers
Ball storage racks