(Standards referenced from International Tennis Federation – ITF)
Minimum Area: 120 ft × 60 ft (36.6 m × 18.3 m)
Recommended Area: 130 ft × 70 ft (39.6 m × 21.3 m) for extra clearance
Usage: Residential / School / Club / Tournament-level facility
Orientation: North–South preferred to reduce sun glare
Soil & Drainage: Proper grading essential for durability
| Feature | Dimensions |
|---|---|
| Court Length | 78 ft (23.77 m) |
| Court Width – Singles | 27 ft (8.23 m) |
| Court Width – Doubles | 36 ft (10.97 m) |
| Net Height (Center) | 3 ft (0.91 m) |
| Run-off Space (Competitive) | 21 ft (6.4 m) behind baseline |
| 12 ft (3.6 m) on each side |
Clear vegetation and debris
Grade area with ~1% slope for drainage
Compact soil to form a stable base
150–200 mm crushed stone base layer
Proper compaction with roller
Ensures drainage and prevents settlement
| Surface Type | Pros | Cons | Lifespan |
|---|---|---|---|
| Acrylic Hard Court (Concrete/Asphalt + Acrylic coating) | Low maintenance, fast play, tournament standard | Hard on joints | 5–8 years |
| Synthetic Turf (Artificial grass + sand infill) | Softer, good for recreational use | Needs brushing & sand leveling | 5–7 years |
| Clay Court (Crushed brick) | Slower play, excellent for training | High maintenance, weather sensitive | Continuous upkeep |
| Cushioned Acrylic | Shock absorption, professional feel | Higher cost | 7–10 years |
Galvanized steel net posts
Net height: 3 ft at center
Chain-link fencing: 10–12 ft height around perimeter
| Usage | Lux Level |
|---|---|
| Recreational | 300–400 lux |
| Tournament | 500+ lux |
6–8 LED floodlights mounted on poles
Estimated Cost (India): ₹4–8 lakh
Player benches
Umpire chair
Ball holders
Windbreaks
Manual or digital scoreboard
Perimeter drainage channels
1% slope for water runoff
Prevents cracks and surface damage
Regular cleaning of surface
Recoat acrylic surface every 5–8 years
Brush & refill sand for turf courts
Repair cracks early to avoid major damage
| Stage | Duration |
|---|---|
| Site Preparation & Base | 2–3 weeks |
| Surface Installation | 2–4 weeks |
| Fencing & Finishing | 1–2 weeks |
| Total Duration | ~6–8 weeks |